City of Los Angeles · SCEP readinessCA contractor license #1108551

LAHD + LADBS correction planning

LAHD & LADBS Order to Comply help. A deadline needs a real scope.

We translate the written order into separate tracks for repairs, specialty trades, plans, permits and possible legalization — then coordinate the work that is actually authorized.

Private contractor review

Review my order

1 of 2
Known concerns (select any)

First decision

What kind of problem is each cited item?

Direct correction — repair or replace an existing condition.

Licensed specialty work — electrical, plumbing or another classified trade.

Permit path — plans, engineering, plan check and City inspections may be required.

Legalization question — records and existing conditions must be evaluated before promising a route.

The correction workflow

Built around the actual order.

  1. 01

    Document review

    Agency, case number, cited items and the stated compliance date are captured from the notice.

  2. 02

    Property verification

    Accessible conditions are compared with the written order; hidden conditions remain outside the review.

  3. 03

    Scope separation

    Immediate repairs are separated from design, permit, legalization and specialist questions.

  4. 04

    Execution + records

    Authorized work is scheduled and documented for the owner’s follow-up with the issuing agency.

Owl Tower Group cannot extend a City deadline, dismiss a citation or close a case. Only the issuing authority determines compliance. The date and instructions printed on your order control.

Do not scope from memory

Upload every page of the order.

Talk to a contractor(424) 346-4824