LAHD + LADBS correction planning
LAHD & LADBS Order to Comply help. A deadline needs a real scope.
We translate the written order into separate tracks for repairs, specialty trades, plans, permits and possible legalization — then coordinate the work that is actually authorized.
First decision
What kind of problem is each cited item?
Direct correction — repair or replace an existing condition.
Licensed specialty work — electrical, plumbing or another classified trade.
Permit path — plans, engineering, plan check and City inspections may be required.
Legalization question — records and existing conditions must be evaluated before promising a route.
The correction workflow
Built around the actual order.
- 01
Document review
Agency, case number, cited items and the stated compliance date are captured from the notice.
- 02
Property verification
Accessible conditions are compared with the written order; hidden conditions remain outside the review.
- 03
Scope separation
Immediate repairs are separated from design, permit, legalization and specialist questions.
- 04
Execution + records
Authorized work is scheduled and documented for the owner’s follow-up with the issuing agency.
Do not scope from memory